How to Plan a Construction or Mining Camp with Container Houses

By the FOLDOMO engineering & export team · Updated 16 November 2026

Short answer

Start from headcount and your space standard (international guidance commonly cites at least 4–5.5 m² per worker and one toilet and one shower per 15 workers), then size dormitory, washroom, canteen and office modules. Flat-pack modules suit large camps because they stack up to three floors. A realistic timeline is drawings in 24–48 hours, about 15 days of production for standard modules, sea transit, and roughly three hours of assembly per module.

A well-planned camp keeps a project on schedule; a poorly planned one becomes a daily headache for the site manager. This guide walks through the decisions in the order you should make them.

Step 1 — Start from headcount and duration

Write down three numbers before anything else:

  1. Peak headcount, including subcontractors, and how it changes over the project;
  2. Duration — months or years — which decides how permanent the buildings need to be;
  3. Staff mix — workers, supervisors and managers often need different room standards.

These numbers drive everything else: the number of modules, the utilities and the budget.

Step 2 — Agree the space and welfare standard

Your client, lender or local labour law may set minimum standards. If not, a commonly cited international benchmark is the IFC/EBRD guidance on workers’ accommodation, which includes:

  • at least 4–5.5 m² of floor space per worker in sleeping rooms;
  • one toilet and one shower per 15 workers;
  • no more than 2–8 workers per room, with adequate ventilation, heating or cooling and lighting.

Always check the rules that apply to your country and contract — they take priority.

Step 3 — Size the modules

With the standard agreed, the arithmetic is simple. An 18 m² flat-pack module (FP-20) at 4.5 m² per worker sleeps four people. For a camp of 200 workers that means about 50 dormitory modules, before supervisors’ rooms.

Then add the support buildings:

Zone What it contains Sizing driver
Dormitories Sleeping rooms, storage Workers ÷ beds per room
Washrooms Toilets, showers, wash basins 1 toilet and 1 shower per 15 workers
Canteen & kitchen Dining hall, kitchen, cold store Workers per meal sitting
Laundry Washers, dryers, drying area Headcount
Offices Site office, meeting room, document control Staff numbers
Clinic & first aid Treatment room, rest bed Contract requirements
Security & gate Guard house, access control Number of entrances

Example only — every site is different. Send us your headcount and we will prepare a layout for your site.

Step 4 — Lay out the site

Good camp layouts share a few principles:

  • Separate living and working areas so heavy traffic and noise stay away from dormitories;
  • Group washrooms close to dormitories and on the same utility runs to cut piping;
  • Stack where space is tight — flat-pack modules stack up to three floors, with external stairs and corridors;
  • Leave fire breaks and access routes between building blocks as your fire code requires;
  • Plan for growth by leaving space and utility capacity for extra blocks.

Step 5 — Prepare foundations and utilities

Container-house camps need a level, well-drained base: concrete strip footings, corner pads or steel piers depending on soil and design life. Prepare the following in parallel with production, so installation can start the day containers arrive:

  • power supply and distribution boards (agree the voltage and plug standard with your supplier);
  • water supply, drainage and sewage treatment or connection;
  • internet and security systems.

Step 6 — Build a realistic timeline

Stage Typical duration
Layout drawings and quotation 24–48 hours
Production of standard modules About 15 days (customised: 20–30 days)
Sea transit from Qingdao 3–45 days depending on region
Customs clearance and inland transport Varies by country
Assembly on site About 3 hours per flat-pack module (crew of 4); about 10 minutes to unfold a folding unit

Running foundations and utilities in parallel with production is the single biggest time saver.

Choosing the building type

  • Flat-pack modules — the default for large, multi-storey camps (stackable to three floors, four modules per 40HQ).
  • Folding units — for site offices and small advance camps that need to be running in days and may move with the work front.
  • K-house (light-steel prefab) — for large-span buildings such as canteens, halls and warehouses.

Most large camps combine all three. Tell us your headcount, location and timeline — we will send a free layout and an itemised quote within 24 hours.

Frequently asked questions

How many workers fit in one 20 ft container-house module?

It depends on your space standard. At 4–5.5 m² per worker, an 18 m² flat-pack module houses about three to four people; higher-density layouts are possible where local rules allow.

How long does it take to build a container camp?

For standard modules, allow about 15 days of production, plus sea transit and customs, plus on-site assembly of roughly three hours per flat-pack module with a crew of four. Foundations and utilities should be prepared in parallel.

Do container camps need foundations?

Yes — a level, well-drained base. Common options are concrete strip footings, concrete pads at the corners or steel piers, depending on soil and how long the camp will stay.

Can a container camp be moved to the next project?

Yes. Flat-pack modules can be dismantled and re-assembled, and folding units fold back for transport, so the same buildings can serve several projects.

Free Quotation

Turn this guide into a plan.
Get a quote in 24h.

✓Free layout drawings & 3D renderings
✓Factory-direct price, FOB / CIF / DDP
✓Video factory tour on request
LMS
Export managers onlineEnglish · Español · العربية · Русский · Français