
Where steel learns
to fold.
A 50,000 m² smart manufacturing base, robotic welding lines and 36 inspection points per unit. Walk through every stage — or book a live video tour with our engineers.
Smart manufacturing base
Units per month capacity
Automated production lines
Inspection points per unit
Three minutes
on the factory floor.
From raw steel coil to a sealed container at Qingdao Port — filmed on our own production lines, with no actors and no renders.

The 4K film is in the edit suite.
Meanwhile, see the real thing: our engineers will walk you through the lines on a live video call, at a time that suits your time zone.
- 00:00Raw steel arrives
- 00:48Robotic welding
- 01:40The 10-minute unfold
- 02:35Loading at Qingdao
From steel coil to Qingdao
in about 15 days.
Eight stages under one roof, one production manager per order, and photo updates at every step — so you always know where your houses are.







- 01Day 0–2
Design & drawings
Engineers turn your site plan into layout drawings, 3D renderings and a full bill of materials — free, usually within 48 hours.
- 02Day 3
Steel cutting
Galvanized steel coil is CNC-cut, punched and roll-formed into frame profiles, every part traceable to its mill certificate.

- 03Day 4–6
Robotic welding
Frames and hinge joints are welded on jig-fixed robotic cells, so seam number 1,000 is identical to seam number one.

- 04Day 7–8
Galvanizing & painting
Shot-blasted, zinc-protected steel receives anti-rust primer and an electrostatic top coat in any RAL colour.

- 05Day 9–12
Panel assembly
Insulated sandwich panels, windows, door, wiring and lighting are installed on the line — the house leaves the hall finished.

- 06Day 13
36-point QC
Dimensions, welds, coating, insulation, electrics and a full fold-unfold cycle are measured, signed off and photographed.

- 07Day 14
Folding & packing
Each unit is folded flat, strapped, corner-protected and labelled by layout position — up to six per 40HQ container.

- 08Day 15
Loading at Qingdao
Containers are loaded and sealed under supervision and leave Qingdao Port with a full set of export documents.

36 checkpoints.
Zero surprises on site.
Every unit passes three inspection gates before it is folded. You receive a photo report for each house — and you are welcome to send your own inspector.
Steel grade and thickness, zinc coating, panel density and fire rating — checked per batch against mill certificates.
Weld seams, frame squareness, hinge torque, coating thickness and electrical routing at every station.
Full fold-unfold cycle, water-spray leak test, insulation resistance and a signed photo and video report.

A closer look.
Welding halls, finishing lines and the container yard at Qingdao. Prefer to see it live? We host buyers at the factory every week.






